NovoGen Engineering Solutions was awarded the contract for Project Management and Client Engineer Services associated with the construction of a power plant in Kilshane, County Dublin, within the Fingal County Council area. NovoGen will use its expertise to oversee the design, build and installation of the 300 MW turbine and generator, which will power the plant, including the commissioning and testing stage before it is connected to EirGrid.
This project is about resilience and flexibility. As Ireland moves towards a net zero energy system, it needs reliable backup generation to complement growing renewable resources. It also offers a future pathway to decarbonisation, with the potential for hydrogen blending and other low-carbon fuels. The key challenges include:
Technical and Engineering Challenges
Project Management Challenges
NovoGen Engineering Solutions faces a multi-dimensional set of challenges, including highly technical engineering demands, cross-border project management, specialised workforce scaling, regulatory compliance, and risk management under confined timelines. Successfully navigating these challenges will be essential for the plant’s timely commissioning, alignment with Ireland’s energy transition goals, and consolidation of NovoGen’s position in green energy technology project management.
NovoGen’s deliverables emphasise both hands-on technical oversight of critical plant components and strategic project management, ensuring that the Kilshane power plant is delivered on time, safely, and operationally ready for connection to the national grid.
NovoGen Engineering Solutions was selected for the Kilshane power plant project due to its specialist engineering expertise in high-value sectors like aerospace and hydrogen technology, its proven capability to manage complex projects such as turbine and generator installation